Project: Geek   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:Gary Phenning   -  
Project:   Kitfox - Series 7   -   VIEW REPORTS
Total Hours:1393.7
Total Flight Time:0.4
Start/Last Date:Mar 06, 2021 - Apr 06, 2024
Engine:Rotax 912is
Propeller:Whirlwind
Panel:Garmin G3x
 
Friendly URL: https://eaabuilderslog.org?s=Geek

Home or Last Project Picture

Jul 15, 2022     Port Wing Plumbing - (10 hours)       Category: Wings
Covered the lower half of the port wing, let it sit for 24 hours and then this morning I tightened it up. Then came the part of plumbing and installing the wiring in the wing. I installed the mast as well as the pitot tube/AOA itself. Ran the tubing to the outboard edge of the wing where I will route it down the aft spar later. Installed the Outside Air Temp (OAT) sensor and ran the wiring for that to the outboard edge of the wing. Installed the magnetometer and its wiring cable. At the outside edge of the wing, I combined the OAT, Magnetometer and the Landing/Navigation light wiring all into one covered cable that will route down the aft spar along with the pitot tubing. Next up will be to go back and check/test all the wiring so I am certain it's all good. Once that's done, I'll cover the top of the port wing.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.